Back to blog
YESS Power news

FEC Novaci Solar and Battery Storage Project

FEC Novaci combines 30 MW / 60 MWh of battery storage with a 55 MWp solar plant in North Macedonia. YESS Power delivered turnkey system integration and EPC with technology partner Cubenergy. Delivered in February 2026, the system is in operation.

FEC Novaci solar and battery storage project

Article

FEC Novaci in North Macedonia combines a 30 MW / 60 MWh BESS with a 55 MWp solar plant. The BESS was delivered in February 2026 and is in operation. The solar plant was completed in 2023, covers 57 hectares and generates about 85,000 MWh annually.

The BESS has a power rating of 30 MW and an energy capacity of 60 MWh. It was delivered in February 2026 and is in operation.

Published by YESS Power

Get a project proposal

We use necessary storage to run this site. Optional maps and analytics stay off unless you allow them.