Back to blog
YESS Power news
YESS Power at Belgrade Energy Forum 2026
Sedat Akar presented FEC Novaci, which combines 30 MW / 60 MWh of battery storage with a 55 MWp solar plant. Discussions covered technology selection, system integration, responsibilities and project economics.

Article
The presentation covered FEC Novaci, where a 30 MW / 60 MWh BESS is integrated with a 55 MWp solar plant. The system was delivered in February 2026 and is in operation. Technical discussions covered technology selection, electrical integration and delivery responsibilities.
Published by YESS Power
Get a project proposal


